Prices are basic and depend on the scope of work and location. For more precise calculations, please request a personalised quotation.
Construction Works | ||
Work Description | Unit | Price (€) |
Surface plastering | m² | 8 |
Metal frame construction | m² | 16 |
Insulation with rock wool | m² | 7 |
Light concrete use on subfloor | m² | 38 |
Subfloor on beams | m² | 44 |
Partition wall construction using building blocks | m² | 36-52 |
Terrace board installation | m² | 25 |
Drywall installation on frame | m² | 18 |
Finishing Works | ||
Work Description | Unit | Price (€) |
Ceiling finishing works | ||
Comprehensive finishing (2x puttying and sanding, priming, 2x painting) | m² | 24 |
Painting, two coats | m² | 11 |
Painting, two coats with putty corrections | m² | 14 |
Surface puttying (1 layer) | m² | 9 |
Crack puttying (with mesh / tape) | PM | 24 |
Drywall ceiling installation | m² | 34 |
Modular ceiling installation | m² | 14 |
Stretch ceiling installation (with material) | m² | 38-60 |
Wall Finishing Works | ||
Work Description | Unit | Price (€) |
Old wallpaper removal | m² | 5 |
Comprehensive finishing (2x puttying and sanding, priming, 2x painting) | m² | 22 |
Painting, two coats | m² | 11 |
Painting, two coats with putty corrections | m² | 14 |
Surface puttying (1 layer) | m² | 7 |
Crack puttying (with mesh / tape) | PM | 24 |
Wallpaper installation | m² | 12 |
Paintable wallpaper painting, two coats | m² | 6 |
Decorative stone installation | m² | 30 |
Window or door frame installation | set | 42-68 |
Floor Finishing Works | ||
Work Description | Unit | Price (€) |
Preliminary works (underlay, film) | m² | 3.5 |
Laminated parquet installation | m² | 11 |
Floor leveling with mixture | m² | 12 |
Carpet laying | m² | 11 |
PVC or natural linoleum installation | m² | 13 |
Skirting installation (PVC, MDF) | PM | 5 |
Wooden skirting installation | PM | 11 |
Tiling Works | ||
Work Description | Unit | Price (€) |
Waterproofing | m² | 9.5 |
Tile installation (ceramic) | m² | 38 |
Tile installation (SLAB) | m² | 46 |
Tile cutting at 45° angle | PM | 20 |
Mosaic installation | m² | 38 |
Tile skirting installation | PM | 24 |
Installation Works | ||
Work Description | Unit | Price (€) |
Door block installation | pc. | 84-95 |
Windowsill installation | pc. | 44 |
Toilet installation on the floor | pc. | 64 |
Toilet installation on the frame | pc. | 123 |
Mixer installation | pc. | 31 |
Sink installation | pc. | 34 |
Electrical wiring installation | h. | by agreement |
Low voltage wiring installation | h. | by agreement |
Additional Works | ||
Work Description | Unit | Price (€) |
Trash removal | m³ | 40-60 |
Construction material transport | h. | 32 |
Goods delivery to the floor | h. | starting from 23 |